Skip to content
Success

Changes

Summary

  1. feat(tidb): add merged TiFlash integration test job (#3600) (commit: b35af6a) (details)
Commit b35af6a83fbb2c2e136220369c22ca1dc434cb64 by noreply
feat(tidb): add merged TiFlash integration test job (#3600)

Relate to https://github.com/PingCAP-QE/ci/issues/3601

Currently, it is necessary to observe the stability for two weeks before
enabling status reporting and removing the WIP label.
(commit: b35af6a)
The file was addedpipelines/pingcap/tidb/latest/pod-merged_tiflash_integration_test.yaml
The file was addedjobs/pingcap/tidb/latest/merged_tiflash_integration_test.groovy
The file was addedpipelines/pingcap/tidb/latest/merged_tiflash_integration_test.groovy
The file was modifiedprow-jobs/pingcap/tidb/latest-postsubmits.yaml (diff)