Skip to content
Success

Changes

Summary

  1. opt(tikv/pd): fix the pull_integration_copr_test job for [v7.4 ~ v8.4] (commit: 10d0367) (details)
Commit 10d0367425a66638d0b9d92a2f5f252d1bb5a550 by noreply
opt(tikv/pd): fix the pull_integration_copr_test job for [v7.4 ~ v8.4] (#3266)

add supports for release feature branches and hotfix branches, keep it
same with TiDB's CI jobs.

Signed-off-by: wuhuizuo <wuhuizuo@126.com>

---------

Signed-off-by: wuhuizuo <wuhuizuo@126.com>
(commit: 10d0367)
The file was modifiedpipelines/tikv/pd/release-8.1/pull_integration_copr_test.groovy (diff)
The file was modifiedprow-jobs/tikv/tikv/release-7.5-presubmits.yaml (diff)