Skip to content
Success

Changes

Summary

  1. pipelines(tiflow): Remove prepare stage timeout (commit: 335d7ee) (details)
Commit 335d7eef728f3b146d31d79849dc40be7d290e85 by wuhuizuo
pipelines(tiflow): Remove prepare stage timeout
(commit: 335d7ee)
The file was modifiedpipelines/pingcap-inc/tiflow/release-8.5/pull_cdc_integration_pulsar_test.groovy (diff)
The file was modifiedpipelines/pingcap-inc/tiflow/release-8.5/pull_cdc_integration_storage_test.groovy (diff)
The file was modifiedpipelines/pingcap-inc/tiflow/release-8.5/pull_cdc_integration_mysql_test.groovy (diff)
The file was modifiedpipelines/pingcap-inc/tiflow/release-8.5/pull_cdc_integration_kafka_test.groovy (diff)